Pelican Parade
The recent days of rain provided a well timed opportunity to check the functioning of some of our stormwater designs. At 16 Pelican Parade while it was raining there was no ponding on the earthworks or the 80m+ long driveway. The whole site’s stormwater is captured on the driveway and adjacent inlet pits into the infiltration tank below the driveway.